Requirements and Environmental Design for LCD Splicing Wall
Number of views:1815order Release Date:2020-11-26
To ensure the smooth implementation of the LCD splicing wall construction project and the normal operation of the system equipment, the construction of the equipment must meet the following environmental conditions:

1、 Power supply

Considering that the system may encounter special situations where there may be a current surge due to the interruption of power supply, the splicing unit itself has a power protection design to ensure the normal and safe operation of the equipment.

1. The power supply voltage should be stable and reliable, especially to prevent immediate power up after power failure. Therefore, in principle, the power supply of the splicing system must be powered by a corresponding power UPS.

2. The splicing system, image controller, and control PC require in-phase power supply.

3. The system equipment should have good grounding, with a grounding resistance of less than 2 Ω, to ensure that the equipment is not damaged in the event of special conditions such as lightning strikes.

4. The power supply of the system is AC 220V ± 5%; Use a three eye socket with a protective grounding wire; The number of sockets is related to the number of splicing units

2、 Light requirements

1. If the windows in the control room are large, direct sunlight should be avoided and curtains should be used to block the light. The curtains should be dark in color.

2. It is recommended to use recessed tube lights for lighting. The lights should not be directly aimed at the screen direction and should be kept at a distance of 3 meters from the screen to avoid affecting the projection effect.

3、 Air conditioning requirements

1. There should be good temperature control and heat dissipation measures in the maintenance channel behind the splicing screen panel. If it is a central air conditioning system, there should be air conditioning inlet and outlet ports. If there is no central air conditioning system, specialized air conditioning should be added, and the power of the air conditioning system depends on the size of the large screen.

2. The temperature inside the maintenance channel and the temperature in the control room of the splicing curtain wall should be controllable and kept basically the same.

4、 Installation requirements

② The cabinet base is usually in direct contact with the anti-static floor to ensure that the ground can withstand gravity for a long time without deformation.

① The installation ground requires a flat and sturdy surface, strong load-bearing capacity, and is not easily deformed.

5、 Requirements for wiring and trunking

1. If it is a fixed floor such as floor tiles or composite wood flooring, it is required that there is a wiring groove between the signal source (computer RGB signal, video signal) and the control computer to the graphics controller (or projector interface), and the shorter the wiring distance, the better.

2. Weak current cables (RGB, video, network, serial port, mouse and keyboard extension cables, etc.) should be routed separately from strong current cables to avoid signal interference. If using cable trays, it is not possible to share one cable tray, and different cable trays should be used for separate wiring.

3. If it is an anti-static floor, holes should be opened at the wiring outlet to leave cable outlets.

6、 System environment

1. The temperature and humidity of the air conditioner before and after splicing the screen should be adjusted to the same scale to ensure the heat dissipation of the splicing wall and the flatness of the splicing screen

2. The fire sprinkler shall be as far away from the splicing wall as possible, and spray extinguishing agent shall be used.

3. The splicing curtain wall room requires cleanliness and dust prevention.

4. The back of the splicing system is a maintenance channel, and the width of the maintenance channel is generally not less than 0.60 meters

5. Large screen rooms require good temperature and humidity control. The working environment temperature is 0 ℃ -40 ℃, and the relative humidity is 10% -90%. There should be air conditioning behind the spliced curtain wall.

7、 Requirements for decoration and equipment location of operation console (room)

1. The placement of the image controller should be located in the aisle (inside the cabinet) next to or behind the curtain wall, and should be as close as possible to the projection box

2. The control computer should be located as close as possible to the opposite direction of the splicing screen and at a suitable distance from it for debugging, color adjustment, and other operations.

3. The position of the operation control computer should be directly opposite the splicing screen, and it is required that the operator can easily and intuitively see the operation of the splicing screen. If there is a dedicated partitioned operation control room, there should be transparent glass between the operation control room and the large screen display room for easy viewing by the operator.


Contact Us
Address: Building B, Lihao Yongda Technology Park, No.1 Dongfang Avenue, Guangming District, Shenzhen
Phone: 0755-23576861
24-hour service hotline: 139 2371 0018

QR code
CopyRight ? 2017 Shenzhen Jintong Display Technology Co., Ltd. All Right Reserved
展開(kāi)
  • Tel

  • 075523576861
QR code
色婷婷一区二区三| 一本大道大臿蕉视频无码 | 日文中文字幕乱码一二三区别| 操笔av蜜臀一区| 韩国三级丰满少妇高潮| 亚洲国产精品国语在线| 人人妻人人妻人人片av| 亚洲成人无码影片| 亚洲av毛片一区二区三区| 国产一区二区内射最近更新| 无码高清一区| 人妻人妇500| 久久久精品浪潮| 国产精品美女久久久久AV爽李琼| jizz人妻| 日韩毛片AV片| 成人av激情在线| 国产精品禁九九九精品| 国产一二三四区中| 日韩欧美精品有码在线洗濯屋| 国产妇女毛茸茸| 免费人成在线视频| 办公室撕开奶罩揉吮奶头漫画| WWW.俺也| 国产精品免费久久久久久蜜桃| 一起草草草视频在线观看| 国产女人爽到高潮a毛片| 人人看人人摸天天添| 精品国产乱码久久久久久108| 欧美丰满少妇xxxx性| 97久久精品無碼| 国产精品福利自产拍在线观看| 国产精品无码电影在线观看| 国产有粗有大有爽免费视频| 成牟α无码毛片一级视频| 亚洲一卡久久4卡5卡6卡7卡| 西西成人无码| 日日夜夜影院| 国产成人无码AV片在线观看| 亚洲av成人片色在线观看| 国产精品99久久免费观看|